Assignment | Assuming you are working on the installation of the PV systems and your task is to plan and manage the entire project from design to installation stages. Part 1: For each scenario, prepare an Excel spreadsheet that specifies each task and timeline that should be followed to complete the design and installation of the PV system:
Part 2: Identify the safety procedures and equipment for each of the scenarios to align with OSHA regulations in regard to PV installation. (Hint: use the Required Reading, "Green Job Hazards: Solar Energy," as a reference.) DeliverablePrepare a report showing Parts 1 and 2. The report is to be no more than three double-spaced pages in a 12 point font. Include the tables from the Excel spreadsheets. |