Rubric for Term Project Background Document
Category Weight 40 - 31 points 30 - 21 Points 20 - 11 Points 10 - 1 Points 0 Points
Title Page 3% Included project title,
student’s name, course
number and date
Included only 3 of the 4 required elements Included only 2 of the 4 required elements Included only 1 of the 4 required elements No title page or none
of the required
elements were
included
Brief description of the project 10% Brief, two-page, objective, technically written; description of the project; including the following topics:
1. Background Information
2. Location of project
3. Need for project
4. Projected outcome
Brief two-page, objective, technically written description including topics 1-4 Brief one-page, objective, technically written description but not including background and needs discussion. A non-objective, nontechnical one-page description incorporating topics 1-4. No project description presented
Base map showing the study area in question 37% Complete base map showing the following elements:
1. Starting and ending points
2. North Arrow
3. Scale Bar
4. Legend
5. Buildings
6. Floodplains
7. Wetlands
8. Landuse
9. Project Boundary
10. Completed route map
showing the selected route
and the two alternative
routes.
1. Elements 1-4 plus 4 of the remaining elements.
2. Completed route map showing the selected route and one alternative route.
1. Elements 1-4 plus 3 of the remaining elements.
2. Completed route map showing the selected
route and no alternative routes.
1. Elements 1-4 not displayed, but 2 of the remaining elements
displayed.
2. Completed map showing all three routes, but no selected route.
1. No base map presented, or no elements displayed on the base map.
2. Map showing no selected route or alternative routes.
Route Evaluation Spreadsheet 10% Route statistics have been entered into each route category (9 numeric values total). Route statistics have been entered for 2 of 3 route categories. Route statistics have been entered for 1 of 3 route categories. - No route statistics have been entered into the spreadsheet.
Conclusions and opinions about the best route identified in the Combined Rank Chart 40% Conclusion & opinions based on information gathered from 1) Background data, 2) Base map, 3) Selected route map and 4) Combined Rank Chart. Conclusions & opinions based on information gathered from 3 of 4 criteria listed in 4 Point Column. Conclusions & opinions based on information gathered from 2 of 4 criteria listed in 4 Point Column. Conclusions & opinions based on information gathered from 1 of 4 criteria listed in 4 Point Column. No conclusions or opinion presented.

The grade for each category is calculated by multiplying the weight for the category times the number of points awarded for that category to arrive at the weighted score for each category. The final grade is the sum of all category-weighted scores. See the following example.

Example Grading
Category Weight Points Earned Weighted Score
Title Page 3% 40 1.2
Project Description 10% 20 2.0
Base Map 37% 30 11.1
Route Evaluation
Spreadsheet
10% 30 3.0
Conclusions 40% 30 12.0
Total Score - - 27.3 out of 40
= 68%